The newly completed head office building required thorough post-construction cleaning before
occupancy, including removal of construction dust and preparation of interior spaces for
operational use.
SCDP — Head Office (Douala)
SCDP — Head Office (Douala)
Service
Post-Construction Cleaning
Client
SCDP
Project Type
Industrial / Administrative Building
CHALLENGE
APPROACH
• Conducted a full site assessment to identify cleaning requirements
• Removed construction dust and debris from interior surfaces
• Cleaned floors, glass surfaces, and common areas
• Coordinated the work to ensure timely completion before building occupancy
- Assessed façade geometry and access requirements
- Deployed rope access methods where most effective
- Implemented safety protocols and coordination procedures
- Scheduled work to minimize impact on occupants
OUTCOME
The building was delivered clean and ready for occupation, meeting the client’s requirements for final site preparation.